On step 288 on the super kit instructions for striker, we are not sure if this is a error on us or the instructions. The L channel wont line up with the screws so we cant put any screws in. Has anyone else run into this problem?

Clearly, trying to line up two hole spacing to three diagonal is problematic. We were able to create this join by loosely installing each screw before tightening up the assembly. The two standoffs are clearly not parallel afterwards, but I think that it is possible.

Thank you for your help! My team will try this out! :slight_smile: