Hi all, attached below are a few photos of the problem I am about to describe.
My team and I are trying to build the VEX V5 competition bot, and we are at the stage where the 24x pitch shaft is connected to the claw arm by sliding it through the stacks of drive shaft lock bars. However, it is not fitting through said drive shaft lock bar. Interestingly, it fits through the 1st and 3rd holes, but not the middle hole (i.e the hole it’s supposed to go into). I’ve tried other shafts, other bars, and even other kits and the issue seems to be recurring. Has anyone else encountered this issue? Please let me know if you have a solution, or what an apporpirate next step might be!
The lock bars are weird, and I’ve never really messed with them. I have that issue a lot when I do try to use them. My team hasn’t build the herobot, but a way you can get the same effect is use a gear, screw the gear into the c-channel, and stick the shaft through the gear. It’s not very space, efficient, but it works. We do this when we actually use the gear, but it will work even if you’re not. Here’s a low quality picture transferred to my laptop in a very questionable way by taking a picture of my phone screen with my laptop camera:
Thank you so much! That helps a lot. I would really appreciate it if you could send the slightly higher-res photo over whenever you have a moment. Thanks for your help
Be careful about torque on the hero bot so this doesn’t go to waste. We have a huge organization, and two of our sister teams have twisted and broken the arm axle shortly after being built. Before you do this, I highly recommend a separate motor solely for the arm axle or, if possible, use a high strength drive shaft.